Pricing Guide / Bath & Safety

Shower Enclosure Prices Philippines — Frameless vs Framed

Understand the pricing behind luxury bathroom enclosures. See how configuration shapes and hardware finish choices impact the final quote.

Shower Enclosure Cost Breakdown.
₱8,000+ Single Panel Splash Guard
₱18,000+ Inline (Straight) Set
₱22,000+ Sliding Tub Enclosure
₱24,000+ L-Shape Corner Set

Pricing Estimates

Enclosure Configuration Glass & Hardware Spec Estimated Cost (₱ / Set)
Single Fixed Panel (Splash Guard) 10mm Tempered / U-Channel ₱8,000 - ₱12,000
Inline (Straight) Enclosure 10mm Tempered / Swing Door ₱18,000 - ₱26,000
L-Shape Corner Enclosure 10mm Tempered / Swing Door ₱24,000 - ₱34,000
Sliding Tub Enclosure 8mm/10mm Tempered / Stainless Header Track ₱22,000 - ₱32,000
Shower Enclosure Hardware Detail

Hardware Quality Dictates The Price

The primary factor that inflates or deflates a shower enclosure quote isn't the glass—it is the hardware material.

1

Marine Grade Hardware

Cheap quotes often use chrome-plated brass or zinc alloys which blister and rust within 18 months in humid environments. We quote exclusively using Marine Grade 304/316 Stainless Steel for lifelong structural integrity.

2

Glass Thickness

10mm tempered is the code-minimum and our standard. 12mm is recommended for wider panels. The price difference between 8mm and 10mm/12mm is significant but necessary for safety.

3

Configuration Type

A simple inline 2-panel fixed-and-door is the most affordable. Corner, L-shape, walk-in, and curved enclosures require more glass cuts, more silicone joints, and more complex installation.

4

Full Itemized Quotes

Our quotation specifies everything: glass thickness, hinge grade, bottom seal type, sealant brand, and labor. There are never any hidden costs after installation.

Key Features

What Drives Shower Enclosure Cost

Glass thickness, configuration, and hardware grade are the three main price levers.

Glass Thickness

10mm tempered is the code-minimum and our standard. 12mm is recommended for wider panels or premium projects. The price difference is significant but so is the visual and structural difference.

Configuration Type

A simple inline 2-panel fixed-and-door is the most affordable. Corner, L-shape, walk-in, and curved enclosures require more glass cuts, more silicone joints, and more complex installation.

Frameless vs Semi-Frameless

Frameless uses patch fittings and a floor spring, which cost more than the aluminum channel of a semi-frameless system. However, frameless looks dramatically more premium and is easier to clean long-term.

Hardware Grade

Standard 304 stainless steel hinges and handles are included in base pricing. Upgrade to 316 marine-grade stainless (recommended for high-humidity bathrooms) or matte black or brushed gold finish at additional cost.

Site Conditions

Drilling through thick tiles into concrete costs more than drilling into standard screed. Unusually high ceilings, curved walls, or uneven floors all add complexity and time.

Full Itemized Quote

Our quotation specifies: glass thickness and certification, hinge and handle grade, bottom seal type, sealant brand, and all labor. No hidden costs after installation.

Frequently Asked Questions

Common questions about shower enclosure pricing from Philippine homeowners.

What is the average cost of a frameless shower enclosure in the Philippines?

A standard inline frameless shower enclosure (1 fixed panel + 1 swing door, 900mm x 2000mm opening) with 10mm tempered glass and 304 stainless hardware starts at approximately P22,000 to P35,000 installed. Corner configurations, 12mm glass, or premium hardware finishes increase the price.

Is frameless glass much more expensive than semi-frameless?

Yes, typically 30 to 50 percent more. Frameless requires heavier glass (10mm minimum vs 8mm), more expensive patch fittings, and a floor spring pivot instead of a simple hinge bracket. The premium is worth it for the cleaner aesthetic and easier long-term maintenance.

Does the quotation include the shower drain and plumbing?

No. Our quotation covers only the glass enclosure, hardware, and installation. Shower drain, plumbing, tile work, and waterproofing membrane are separate trades. We recommend completing all tile and plumbing work before we measure and fabricate the enclosure, as our panels are cut to exact dimensions.

How long does shower enclosure installation take?

Measurement and fabrication takes 5 to 7 business days after your approval of the quotation. The actual installation day typically takes 3 to 5 hours depending on configuration complexity. We require the tile and plumbing work to be fully completed and cured before installation.

Get Your Shower Enclosure Price

Share your bathroom dimensions and configuration for a detailed quote within 24 hours.

Explore Related

From the Blog

Blog

Shower Glass Thickness Guide